Our mission is to protect all health care workers who interface with patients and the public on a da-to-day basis
INSTATLLATION GUIDELINES
The GUV unit are to be installed on a solid wall or ceiling as to prevent sagging or tilting leading to irradiation angle deformation over time.
- The GUV units have to be installed with the power pack facing downwards.
- The top of the unit needs to be level with the floor in the width of the unit as well as irradiating direction.
- The GUV units should not be installed closed to the floor than 2300mm (2.3 Meters) from the floor to the bottom of the fitting (higher is better, ceiling permitting) and no higher than 3000mm (3 meters)
Additional information
Brand | |
---|---|
STEP 1: Choose Delivery Method |
Did you know that you are now able to purchase online and collect from our Branches? Change the Delivery or Collection drop down to one of our Branches and have your goods ready for collection in 4 hours! Need to split you order between Delivery and Collection? No problem, just specify this when selecting the Delivery or Collection option for the products that you wish to purchase.